會議論文

學年期 標題 Sdgs 更新時間
091 / 1 Optimal ordering strategy of the inventory system with controllable lead time 2010-06-16
090 / 2 考慮可控制前置時間及貨幣時間價值因素之存貨系統最適訂購策略 2010-06-16
085 / 2 涵括可變動前置時間和不良品的最佳存貨策略 2015-11-12
092 / 2 A minimax distribution free procedure for an integrated vendor-buyer inventory model with defective item and controllable lead time 2015-11-26
092 / 1 An integrated vendor-buyer cooperative inventory model involving defective items 2010-06-16
093 / 1 A Minimax distribution free procedure for the integrated vendor-buyer inventory model with quality improvement and lead time reduction 2010-06-16
093 / 1 An optimal replenishment policy for non-instantaneous deteriorating items under permissible delay in payments 2015-11-26
094 / 1 An EOQ model with limited storage capacity under trade credits 2010-06-16
092 / 1 The supply chain model for a single-vendor single-buyer system with defective items and controllable lead time 2010-06-16
094 / 1 Deterministic inventory model for deteriorating items with demand rate dependent on displayed stock level and limited storage 2015-11-12
093 / 1 Impact of investing in quality improvement and lead time reduction on the integrated vendor-buyer inventory models 2015-11-26
093 / 2 Vendor-buyer inventory system with sub-lot sampling inspection policy and controllable lead time 2010-06-16
100 / 2 The positive effect of corporate social responsibility on green intellectual capital 2014-09-22
093 / 1 Optimal pricing and replenishment policy for non-instantaneous deteriorating item with price sensitive demand 2014-08-27
090 / 2 考慮貨幣時間價值因素及可控制前置時間之存貨模式 2014-05-28
090 / 2 同時考慮可控制前置時間及貨幣時間價值因素之存貨訂購策略 2014-10-23
096 / 2 The optimal special order policy for deteriorating items with announced increase price under limited special order quantity 2014-07-31
092 / 2 生產率與需求有關、需求與價格有關且部分欠撥之退化性產品的生產批量存貨模型 2014-07-31
092 / 2 The supply chain model for a single-vendor single-buyer system with defective items and controllable lead time 2014-08-25
101 / 1 創業願景與願景分享對創業績效之研究 2013-10-07
097 / 2 Optimal Ordering Policy in Response to a Temporary Price Discount with Lead Time Linked to Order Quantity 2013-10-08
099 / 1 保險業顧客生命價值之研究 2013-10-14
091 / 1 在實收貨品數量不確定下前置時間與整備成本可縮減之連續盤查存貨模式 Lead Time and Setup Cost Reductions in Continuous Review Inventory Model When the Amount Received is Uncertain 2014-05-22