100 / 2 |
Optimal warranty policy for a Pareto distributed products based on progressive censored sample
|
|
2014-09-22 |
100 / 2 |
Optimal progressive group censoring scheme under cost considerations for Pareto distribution
|
|
2014-09-04 |
101 / 1 |
Reliability sampling plans under progressively first-failure censored in presence of cost constraint
|
|
2014-10-06 |
099 / 2 |
Optimal Progressive Group-Censoring Plans for Logistic Distribution Under Cost Constraint
|
|
2014-07-15 |
093 / 2 |
Dealing with correlated data in SQC
|
|
2014-07-15 |
092 / 2 |
A new estimation procedure in SPC when the process data is correlated
|
|
2014-07-15 |
094 / 1 |
An application of truncated life tests on reliability data
|
|
2014-07-15 |
093 / 1 |
Improved square root transformation attribute control charts
|
|
2014-07-15 |
093 / 2 |
A new heuristic R chart for skewed distributions
|
|
2014-07-15 |
089 / 2 |
A more accurate ridge estimation procedure on linear regression model
|
|
2014-07-15 |
093 / 1 |
An alternative procedure in SPC for dealing with correlated data
|
|
2014-07-15 |
094 / 1 |
逐步型一設限分群資料之最適逐步應力加速試驗
|
|
2014-07-15 |
097 / 1 |
Inference for the parameters of the lognormal distribution based on progressive censored sample
|
|
2014-07-15 |
096 / 2 |
Statistical Inference based on progressive first failure-censored samples from Gompertz distribution
|
|
2014-07-15 |
094 / 2 |
Optimal progressive group-censoring plan
|
|
2014-07-15 |
096 / 1 |
成本限制下之最適逐步型一分群加速壽命試驗
|
|
2014-07-15 |
097 / 2 |
逐步型一區間設限在成本限制下的可靠度抽樣計畫
|
|
2014-07-15 |
098 / 1 |
Estimation and prediction for Weibull model based on progressively type II censored data
|
|
2014-07-15 |
088 / 2 |
Fuzzy-weighted estimation in ridge regression analysis
|
|
2015-10-16 |
103 / 2 |
Optimal inspection length under progressive interval censoring with competing risks
|
|
2016-06-28 |
104 / 1 |
Interval estimation for the generalized inverted exponential distribution
|
|
2016-06-28 |
105 / 1 |
Functionality of applying virtual sensor in obscure R&D process — Perspective from Knowledge Management
|
|
2017-05-04 |
105 / 1 |
Optimal multiple-level constant-stress accelerated life test with competing risks
|
#09.產業創新與基礎設施
|
2017-11-09 |